Jane bathroom project

Job Description  of  Jane`s bathroom 

  •   remove existing tiles, ceiling and bathroom furniture
  •   remove and install new stud wall for new door position and hang new door
  •   lay plywood floor and make level
  •   install basin taps and install basin unit and re-pipe basin and waste in new position
  •   cut back pipe work and install close coupled/back to wall toilet in new position
  •   re-pipe for thermostatic shower valves and shower head
  •   install shower tray frame and tray and re-pipe waste in new position
  •   install new plasterboard ceiling and fit 3/4 downlighterstall stud wall
  •   box in pipes to basin
  •   remove old  and reside and re-pipe new radiator
  •   tile floor and wall area
  •   plaster wall / ceiling as required
  •   install shower head and concealed thermostatic shower valves
  •   install shower screen

Photo Galery